The project identified 6 sites where conservation-led restoration of the watercourse habitat is required, and which could subsequently be used to demonstrate techniques and disseminate knowledge and experience of this work. For the application submission, an outline design for each site has been drawn up.
Post-works assessment of the STREAM restoration project sites at Upper Woodford (R. Avon) (STREAM11)
Downloads available for this record
File | Uploaded |
---|---|
STREAM11, PDF, 2.9 MB | 2012/01/10 |
Location
This record relates to the location identified by the marker on the map: