This report records observations and data from the site and concluded that in 1993 it was recovering from the perceived drying. The following recommendations were made for its recovery:
- some form of hydrological monitoring;
- the timing of site integrity monitoring visits with climatic trends;
- level survey of the outlets to make the bunding more effective.
A printed copy of this old English Nature report is available from our Enquiry Service. Tel: 0845 600 3078 Email: enquiries@naturalengland.org.uk